My first trip up the mountain revealed that the construction crews have finished with the summit esplanade: it's all bricks and tile now, the surface having been completed in my absence. However, the bricks appear to be of the rubberized variety; they gave under my steps and felt springy. As was true with the wooden coverings over the stone steps leading up from Namsan Library, I have to wonder how long this sort of covering will last under the constant pressure of thousands and thousands of tourists' feet. We'll see. On the bright side, such surfacing is easily and cheaply replaceable, which is probably why it was chosen. Heavy flagstones, once broken, are a pain to replace, especially when they're up on a mountaintop.
The rain was on and off during my walk up the mountain, and the mountain road itself was largely deserted. Tourists are fair-weather friends; they don't flock to Namsan when it's too cold or too rainy or too snowy. It was good to go up in relative quiet.
_
No comments:
Post a Comment
READ THIS BEFORE COMMENTING!
All comments are subject to approval before they are published, so they will not appear immediately. Comments should be civil, relevant, and substantive. Anonymous comments are not allowed and will be unceremoniously deleted. For more on my comments policy, please see this entry on my other blog.
AND A NEW RULE (per this post): comments critical of Trump's lying must include criticism of Biden's or Kamala's or some prominent leftie's lying on a one-for-one basis! Failure to be balanced means your comment will not be published.